Kitchen Project Photos

Scotty Comments: 

I am very pleased with the Design-Build Concept utilized in the Kitchen Make-Over.  After the Prior Contractor Dropped the Ball on the project.  Scotts Contracting was hired to finish the project.  We added: Accent Lighting, Insulation, Air Sealing, New Plumbing Vent Stack and Drain Line, Coffered Ceiling, Energy Efficient Lighting Choices, among numerous other Design and Installation’ Options  

I’m working on the photos on this page to
2012-04-14 003See additional Project Photos for the Kitchen Remodel Project Located in the St Louis South Hampton Region.










2 Types of Energy Efficient Accent Lights was chosen for this project
Pictured are the Coffered Ceiling Accent Lights controlled
by the  below Leutron Dimmable Light Switch.
Accent Lights controlled
by Leutron Dimmable Light Switch


Installing the Accent Lighting
Installing the Accent Lighting


2012-04-11 001

2012-04-11 002
Measure 2x—Cut 1x

2012-04-11 003
2012-04-12 001
2012-04-12 003
2012-04-12 004
2012-04-13 001

2012-04-13 003
2012-04-13 005
2012-04-13 006
2012-04-13 007

Scotty, Scotts Contracting- Installing the Energy Efficient Lighting
Scotty- Installing the Energy Efficient Lighting

2-Scotty, Scotts Contracting- Installing the Energy Efficient Lighting

Leave a Reply-Scotty will respond asap

This site uses Akismet to reduce spam. Learn how your comment data is processed.